Wall and ceiling area to sheets, screws, and joint compound.
🔨 On 8-ft walls, hanging 12-ft sheets horizontally cuts total joint length by a quarter. Screw spacing: 12″ on ceilings, 16″ on walls. Buy every sheet in one trip — finish batches differ visibly.
The Drywall Calculator is based on the following formula:
wall area = perimeter × height ceiling area = ceiling L × W (skipped if either is 0) buy area = (wall + ceiling) × 1.10 sheets = ⌈buy area ÷ sheet coverage⌉ (4×8 = 32 ft², 4×12 = 48 ft²) screws (lb) = ⌈area ÷ 250⌉ · compound (gal) = area × 0.01, pails = ⌈gal ÷ 4.5⌉
Variables: perimeter = total length of all walls (ft) height = floor-to-ceiling height (ft) 1.10 = 10% waste for cuts and breakage 250 = ft² covered per pound of screws (~1 screw/ft², 300/lb) 0.01 gal/ft² = tape plus two finish coats of joint compound 4.5 = gallons in a standard pail
Board area drives everything: perimeter × height plus ceiling gives square feet, the 10% factor covers cutouts and broken corners, sheets round up to whole panels, and screws and compound scale from the un-wasted area.
Worked example: Step 1: Perimeter 40 ft × 8 ft walls: wall area = 320 ft²; ceiling 12 × 10 = 120 ft²; total = 440 ft². Step 2: Buy area = 440 × 1.10 = 484 ft². Step 3: 4×8 sheets = ⌈484 ÷ 32⌉ = 16 (4×12 would be ⌈484 ÷ 48⌉ = 11). Step 4: Screws = ⌈440 ÷ 250⌉ = 2 lb; compound = 440 × 0.01 = 4.4 gal → 1 pail of 4.5 gal. Result: 16 sheets of 4×8, 2 lb of screws, one 4.5-gal pail.
Board area drives the whole list: sheets with 10% waste, screws at a pound per 250 ft², joint compound at a gallon per 100 ft². A 12×10 bedroom with 8-ft walls and ceiling is 440 ft² — 16 sheets of 4×8, 2 lb of screws, one 4.5-gallon pail of mud.
On 8-ft walls, 12-ft boards hung horizontally eliminate nearly all vertical butts — about a quarter less taping. The trade: they weigh ~30 lb more per sheet and flex in transit. Solo hangers stick to 4×8; that's fine.
Cutouts for outlets, broken corners, and offcuts too small to use consume 10% of stock on a simple room — 15% when walls have bump-outs and closets. Sheets sell whole, so the count always rounds up.
Paper facing and finish tones vary between production runs. Buy every sheet the same day from the same stack, and if you must top up, box the new mud with leftover rather than finish a corner with a different batch.
More tools you might find useful
Perimeter and post spacing to posts, pickets, rails, and concrete.
Room size + waste factor → boxes needed and material budget (ft²/m²).
Check appliances, add the surge, and size the generator before you buy.
Area and depth to cubic yards and tons by material density.